loading

Plastic Molding Company with Customization Service For Many Industries - Mulan Group       Contact@china-plasticparts.com​​​​​​​   +86 021 3479 1660

The importance of cleaning work in vacuum plating process

Author: MULAN –Plastic Molding Manufacturer

The cleaning treatment of vacuum electroplating processing surface is very important, which directly affects the quality of electroplating products. Before the workpiece enters the coating room, it must be carefully cleaned before coating. Surface pollution comes from various dust, lubricating oil, machine oil, polishing paste, grease, sweat stains, etc. adhered to the workpiece during processing, transmission, and packaging. In order to avoid defects caused during processing, vacuum plating manufacturers can basically remove them by degreasing or chemical cleaning. The cleaned surface should not be stored in the atmosphere, but should be stored in closed containers or cleaning cabinets to reduce dust contamination.

Storage of glass substrates in just oxidized aluminum containers minimizes adsorption of hydrocarbon vapors. Because these containers preferentially adsorb hydrocarbons. Vacuum coating processing should generally be stored in a vacuum drying oven for highly unstable and sensitive surfaces to water vapor.

Vacuum coating processing removes dust in the coating room, sets up a clean workshop, and keeps the room clean. These are the basic requirements of the coating process for the environment. In areas with high air humidity, in addition to carefully cleaning the substrate and various components in the vacuum chamber before plating, baking and degassing must also be carried out. To prevent oil from being brought into the vacuum chamber, pay attention to the return of oil from the oil diffusion pump, and oil-retaining measures must be taken for diffusion pumps with high heating power.

GET IN TOUCH WITH Us
recommended articles
BLOGS CASES
no data

Looking for a reliable, quick-turn plastic molding factory of custom plastic parts? With hundreds of processing machineries, our unmatched in-house capacity ensures your parts are shipped on-time, every single time. At Mulan Group, our AS9100-certified facilities are designed for both rapid prototyping and low-volume production of end-use components.

CONTACT US

Tel: +86 21 3479 1660
Add: Building 37, 2049 Pujin Road, Pujiang, Minhang, Shanghai, China Call Us! Get Your Instant Quote Now!
Monday-Friday: 9am to 6pm
Saturday:-Sunday: Close
Copyright © 2025 Mulan Group - www.china-plasticparts.com | All Rights Reserved. | Sitemap
Customer service
detect