loading

Plastic Molding Company with Customization Service For Many Industries - Mulan Group       Contact@china-plasticparts.com​​​​​​​   +86 021 3479 1660

How to improve the speed of injection molding production and injection mold processing!

Author: MULAN -Plastic Molding Manufacturer

What should we do when we encounter slow speed problems in the injection molding process? What causes it? How to increase the speed of injection molding production and injection mold processing? Today, Mulan injection mold processing factory will explain it to you! 1. The plastic temperature and mold injection temperature are high, resulting in long cooling time. 2. Whether the design of the mold is reasonable, the design should be easy to demould, and the design and operation should be fully automatic as much as possible. 3. If the melting time is long, the back pressure should be reduced and the use of recycled materials should be reduced to prevent overhead, and the feeding section should be fully cooled.

4. The machine moves slowly, which can be adjusted through the oil circuit and circuit to accelerate the machine properly. 5. Water dripping from the nozzle hinders normal production. Use self-locking nozzles or reduce nozzle temperature.

6. The manufacturing wall thickness is too large, resulting in too long cooling time. 7. If the heating of the barrel is insufficient, replace the machine with a large plasticizing capacity or strengthen the preheating of the material. 8. Whether the employees have experience and whether the operation is in place.

The above is the relevant introduction brought to you by Shanghai Mulan Precision Machinery Manufacturing Co., Ltd. I hope it will be helpful to everyone. If you want to know more information, please enter our official website, we will provide you with a more detailed explanation!.

GET IN TOUCH WITH Us
recommended articles
BLOGS CASES
no data

Looking for a reliable, quick-turn plastic molding factory of custom plastic parts? With hundreds of processing machineries, our unmatched in-house capacity ensures your parts are shipped on-time, every single time. At Mulan Group, our AS9100-certified facilities are designed for both rapid prototyping and low-volume production of end-use components.

CONTACT US

Tel: +86 21 3479 1660
Add: Building 37, 2049 Pujin Road, Pujiang, Minhang, Shanghai, China Call Us! Get Your Instant Quote Now!
Monday-Friday: 9am to 6pm
Saturday:-Sunday: Close
Copyright © 2025 Mulan Group - www.china-plasticparts.com | All Rights Reserved. | Sitemap
Customer service
detect