loading

Plastic Molding Company with Customization Service For Many Industries - Mulan Group       Contact@china-plasticparts.com​​​​​​​   +86 021 3479 1660

Injection mold factory carries out the elimination plan of the rust fault after the injection molding process is completed

Author: MULAN -Plastic Molding Manufacturer

Rust mold is known to cause quality problems throughout plastic parts. Plastic molds are mainly made of tool steel. At work, corrosive gases, water and other substances that cause rust are encountered, so this problem is ruled out.

Today, the injection mold factory has compiled a plan for troubleshooting the rust after the injection mold is processed. Let's take a look! (1) Gas produced by melting and decomposition. Some materials produce volatile gases when heated. These gases are corrosive and will corrode the mold. Therefore, when the equipment stops working, use a soft cloth to clean the mold and close the mold.

If it is not used for a long time, please spray the anti-rust agent in the cavity, and apply butter on the gate when closing the mold. (2) Cooling water in the mold. Cooling water is usually used in the mold for cooling, so there is more moisture around the molding equipment.

If the mold cools below the dew point, the moisture in the air will form water droplets on the surface of the mold. If it is not wiped off in time, it is easy to rust. Especially after the mold stops working, condensate will be produced very quickly.

Therefore, when molding is stopped, the cooling water is also turned off and the mold is dried. (3) Cemented carbide produced during molding. After the mold runs for a long time, the molding material precipitates and decomposes to form carbides, which often cause the mold to wear, corrode or rust.

In this regard, if carbide formation is observed, it should be removed immediately.

GET IN TOUCH WITH Us
recommended articles
BLOGS CASES
no data

Looking for a reliable, quick-turn plastic molding factory of custom plastic parts? With hundreds of processing machineries, our unmatched in-house capacity ensures your parts are shipped on-time, every single time. At Mulan Group, our AS9100-certified facilities are designed for both rapid prototyping and low-volume production of end-use components.

CONTACT US

Tel: +86 21 3479 1660
Add: Building 37, 2049 Pujin Road, Pujiang, Minhang, Shanghai, China Call Us! Get Your Instant Quote Now!
Monday-Friday: 9am to 6pm
Saturday:-Sunday: Close
Copyright © 2025 Mulan Group - www.china-plasticparts.com | All Rights Reserved. | Sitemap
Customer service
detect