loading

Kunststoffformfirma mit Anpassungsdienst für viele Branchen - Mulan Group         Contact@china-plasticparts.com ​​​​​​​   +86 021 3479 1660

Precautions for CNC machining

Author: MULAN - Plastic Molding Manufacturer

1. After the machining center is powered on, immediately check whether the switch buttons and indicator lights are normal. If there is any abnormality, immediately shut down and report to the maintenance... 2. Before formal machining, the coordinates of the machining center should be returned to zero, and the machine should be idling for 15 minutes It can be officially operated after more than a second. 3. In order to simplify the positioning and installation of the cnc machining center, each positioning surface has a relative processing origin, and all have precise coordinate dimensions... 4. When installing, ensure that the stroke of the workpiece to be processed is within the stroke range of the spindle. 5. When installing the workpiece, ensure that the workpiece is installed tightly, but also be careful not to be too tight and cause loss of positioning accuracy.

Mach mit uns in Kontakt
empfohlene Artikel
BLOGS CASES
keine Daten

Suchen Sie nach einer zuverlässigen, schnellen Kunststoffformfabrik mit kundenspezifischen Kunststoffteilen? Bei Hunderten von Verarbeitungsmaschinen stellt unsere unübertroffene interne Kapazität sicher, dass Ihre Teile jedes Mal pünktlich versendet werden. Bei der Mulan Group sind unsere AS9100-zertifizierten Einrichtungen sowohl für schnelle Prototypen als auch für die Produktion von Endverbrauchskomponenten mit niedriger Volumen ausgelegt.

CONTACT US

Tel:86 21 3479 1660
Hinzufügen: Gebäude 37, 2049 Pujin Road, Pujiang, Minhang, Shanghai, China, rufen Sie uns an! Holen Sie sich jetzt Ihr sofortiges Angebot!
Montag bis Freitag: 9 bis 18 Uhr
Samstag: -sunday: Close
Urheberrecht© 2025 Mulan Gruppe - www.china -plasticparts.com | Alle Rechte vorbehalten | Seitenverzeichnis
Customer service
detect