loading

Companhia de moldagem de plástico com serviço de personalização para muitas indústrias - Mulan Group         Contact@china-plasticparts.com ​​​​​​​   +86 021 3479 1660

What methods can reduce the frequency of repairing injection molds

Author: MULAN - Plastic Molding Manufacturer

In fact, very little maintenance of injection molds comes from the mold itself. The following are the methods for plastic mold processing factories to reduce mold maintenance: 1. Strengthen the training of scientific injection molding knowledge, and try not to damage the molds in production. Improper parameters such as low pressure protection settings, mold clamping speed, mold clamping force, injection speed, holding pressure, mold temperature, etc. will cause great damage to the mold.

2. Production control. Try to avoid the hot runner plug iron and PIN pin in the table from damaging the mold. 3. Avoid problems in the fetus.

The design and manufacturing process of plastic mold processing is pregnant, and there must be no problems at this time, otherwise maintenance is inevitable. For example, the design of the mold 7 system, materials, etc. 4. Mold maintenance.

The primary and secondary maintenance in normal production and the tertiary maintenance of the mold maintenance department must be solidly in place to avoid wire drawing dust, spring breakage/thimble stuck/shovel chicken thorn. 5. Standardization and inventory of wearing parts. The thimble/spring/sleeve/guide post/guide sleeve should be as uniform as possible for stock.

6. Standardize the operation process, personnel training and performance appraisal. If the above six points are done well, mold maintenance accidents can generally be reduced by 50%, and the production efficiency of the enterprise will also be greatly improved.

Entre em contato conosco
Artigos recomendados
BLOGS CASES
sem dados

Procurando uma fábrica de moldagem plástica confiável e rápida de peças de plástico personalizadas? Com centenas de máquinas de processamento, nossa capacidade interna incomparável garante que suas peças sejam enviadas para o tempo, todas as vezes. No Mulan Group, nossas instalações certificadas por AS9100 são projetadas para prototipagem rápida e produção de baixo volume de componentes de uso final.

CONTACT US

Número de correio: contact@china-plasticparts.com
Tel:86 21 3479 1660
Adicionar: Edifício 37, 2049 Pujin Road, Pujiang, Minhang, Xangai e China nos chamam! Obtenha sua citação instantânea agora!
Segunda a sexta-feira: 9h às 18h
Sábado: -Day: Fechar
Copyright © 2025 Mulan Grupo - www.china-plasticParts.com | Todos os direitos reservados | Mapa do site
Customer service
detect